top of page

Some of Our
Projects

Concrete Testing on the North East Link Melbourne

North East Link is the biggest ever investment in Melbourne’s north east – changing the way people move around Melbourne.

As part of Victoria’s Big Build, we’re delivering 3 major road projects. The 6.5km North East Link tunnels from Watsonia to Bulleen will fix the missing link in our city’s freeway network, take 15,000 trucks off local roads a day and reduce travel times by up to 35 minutes. Upgrades to the Eastern Freeway and M80 Ring Road will include new lanes, smart technology and a seamless connection to the North East Link tunnels.

This massive program of works is being carefully planned so the projects can open in 2028 – bringing all the pieces of North East Link together.

 

North East Link Melbourne

NEL.jpg

Pre-cast Concrete Testing on the Sydney Metro - CTP site

Sydney Metro West – Central Tunnelling Package. The contract includes the delivery of twin 11 kilometre tunnels and excavation of five station boxes at Sydney Olympic Park, North Strathfield, Burwood North, Five Dock and The Bays.

Sydney Metro West – Central Tunnelling Package

Testing Equipment.jpg

Pre-cast Concrete Testing on the Sydney Metro - WTP site

Sydney Metro West – a new underground metro railway which will double rail capacity between Parramatta and the Sydney CBD.

Sydney Metro West - Western Tunnelling Package

Sydney Metro - Western.jpg

NSW Transport – Road Stabilisation – Forbes NSW, Grenfell/Weddin Shire NSW

Part Service Provided on the Lachlan Valley Way, Mid-Western Hwy, Thurungle Road and Newell Hwy

RM400.1.jpg

Road Stabilisation – Howlong Shire Council NSW

Part Service Provided on Jude Road and Gibson Place.

RM400.9.jpeg

Road Stabilisation – Strathbogie Shire Council VIC

Part Service Provided on Polly McQuinns Road

RM400.8.jpeg

Boral - Concrete Testing - Shepparton, Culcairn and Albury

Field testing services provided to Boral across Shepparton, Culcairn and Albury areas.

Shep, Alb, Cul area.jpg

Boral - Concrete Testing - Brisbane QLD

Field testing services provided to Boral across the Brisbane area. 

Brisbane Map.jpg

Snowy Hydro 2.0 - Construction of Laboratories - Soil and Concrete Testing 

Snowy 2.0 is the next chapter in the Snowy Scheme’s history. It is a nation-building renewable energy project that will provide on-demand energy and large-scale storage for many generations to come.

Snowy Hydro 2.0

A76961B4-A851-425B-B200-E3FE316397F8_edi
bottom of page